This is an old revision of the document!
Before connecting your power supply to mains power, it is critical that you check and set the 115v/230v Switch on the right-side of the PSU:
Look out for the bright yellow sticker on the top, to help you locate the switch:
Using 3pc x M3x6mm Screws, attach the 3pc x M3x10mm Female/Female Hex Spacers to the Front Panel as shown
Using another 3pc x M3x6mm Screws, attach the Main Board to the front panel by inserting the screws into the other end of the female spacers as shown.
Loosen the terminals on the Meanwell LRS350-24 PSU. Insert the mains wiring first:
Green Wire | Earth |
White Wire | Neutral |
Black Wire | Live |
Make sure to tighten the terminal screws properly.
Then proceed to slide the fingers of the main board under the terminals on the DC side of the Power Supply and tighten all the screws securely.
Using 2pc x M3 x 6mm and 2pc x M4 x 4mm screws, attach the two side panels as shown to the Power Supply and the Main board assembly.
OpenBuilds® PowerCase V1.9 provides mounting holes on both ends that allows you to mount your power supply.
Using M5 x 8mm Screws with M5 Drop-in Tee Nuts for mounting
Insert M5 x 8mm Screw through mounting hole, and install a Drop In Tee Nut behind it
Attach to any V-Slot / C-Beam extrusion - for example one of our Tables