docs:powercase:start

This is an old revision of the document!


Order your OpenBuilds PowerCase with 24v Meanwell PSU

OpenBuilds® PowerCase Features

  • Pre-soldered necessary components ready for simple assembly
  • Covered power leads
  • Compatible with our Xtensions Wiring ecosystem
  • Makes wiring your BlackBox Motion Control system really safe and easy

1. NB: Set the 115/230v Switch

Before connecting your power supply to mains power, it is critical that you check and set the 115v/230v Switch on the right-side of the PSU:

Look out for the bright yellow sticker on the top, to help you locate the switch:

2. OpenBuilds® PowerCase Assembly Video

The following video demonstrates the assembly of an OpenBuilds PowerCase

docs/powercase/start.1593029841.txt.gz · Last modified: 2024/08/05 15:15 (external edit)