docs:powercase:start

OpenBuilds® PowerCase V1.7 - V1.8

Assembly Instructions


1. NB: Set the 115/230v Switch

Before connecting your power supply to mains power, it is critical that you check and set the 115v/230v Switch on the right-side of the PSU:

Look out for the bright yellow sticker on the top, to help you locate the switch:

2. OpenBuilds® PowerCase Assembly Video

The following video demonstrates the assembly of an OpenBuilds PowerCase

docs/powercase/start.txt · Last modified: 2024/08/05 15:15 (external edit)