docs:interface:prepare-blackbox-v2.3-2.6

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
docs:interface:prepare-blackbox-v2.3-2.6 [2021/01/07 15:09]
admin
docs:interface:prepare-blackbox-v2.3-2.6 [2025/01/16 20:04] (current)
admin
Line 1: Line 1:
-==== Prepare a BlackBox V2.3, V2.4, V2.5 or V2.6 to work with OpenBuilds Interface ====+==== Prepare a BlackBox V2.3, V2.4, V2.5V2.6 or V2.7 to work with OpenBuilds Interface ====
  
-The following steps are required for OpenBuilds Interface to connect to an OpenBuilds BlackBox v2.3- V2.6.  Perform all the steps, or you will not be able to connect+The following steps are required for OpenBuilds Interface to connect to an OpenBuilds BlackBox v2.3 - V2. Perform all the steps, or you will not be able to connect
  
-> At the time BlackBox versions V2.3 - V2.were current, Interface has not been invented yet. Luckilly, there is a way to retrofit these older BlackBoxes, avoiding the need to replace them with a newer BlackBox to work with Interface! You will have to do a very easy modification to the PCB.  +> At the time BlackBox versions V2.3 - V2.were current, Interface had not been invented yet. Luckily, there is a way to retrofit these older BlackBoxes, avoiding the need to replace them with a newer BlackBox to work with Interface! You will have to do a very easy modification to the PCB.  
  
  
Line 30: Line 30:
 This modification allows Interface to communicate with the BlackBox V2.4, V2.5 and V.26 boards via AUX1.   It does change one behavior of the BlackBox - it is no longer powered over USB - so the 24v power will need to be connected and turned on whenever you want to work with the BlackBox. As you need 24v connected and switched on for the stepper motors and other accessories as well, it will not be a noticeable difference to most users.   This modification allows Interface to communicate with the BlackBox V2.4, V2.5 and V.26 boards via AUX1.   It does change one behavior of the BlackBox - it is no longer powered over USB - so the 24v power will need to be connected and turned on whenever you want to work with the BlackBox. As you need 24v connected and switched on for the stepper motors and other accessories as well, it will not be a noticeable difference to most users.  
  
-=== c) Insert the TVS Module onto the ICSP header === +=== c) Replace the Top Panel ===
- +
-Included with your Interface, you will find a "TVS Module"  +
- +
-{{:docs:interface:surge_protector_board.png?200|}} +
- +
-The BlackBox has a 6 pin header labelled ICSP.  It is important that you install this module onto the ICSP header.  +
- +
-Line up the "ICSP" label on both to be on the same side. The arrow points toward the Power input side of the BlackBox +
- +
-[[https://docs.openbuilds.com/lib/exe/detail.php?&media=docs:interface:animation-insert-module.gif|{{:docs:interface:animation-insert-module-600px.gif|}}]] +
- +
-=== d) Replace the Top Panel ===+
  
 Make sure the Fan is plugged in - then place the top panel with fan back onto the BlackBox and reattach using the 4 screws you removed in step (a) above  Make sure the Fan is plugged in - then place the top panel with fan back onto the BlackBox and reattach using the 4 screws you removed in step (a) above 
Line 50: Line 38:
 ---- ----
  
- [[{}docs:interface:connect-blackbox|NEXT: Connect your OpenBuilds BlackBox]] + [[{}docs:interface:connect-blackbox-4x|NEXT: Connect your OpenBuilds BlackBox 4X]]  
 + 
 + [[{}docs:interface:connect-blackbox-x32|NEXT: Connect your OpenBuilds BlackBox X32]] 
  
docs/interface/prepare-blackbox-v2.3-2.6.1610032192.txt.gz · Last modified: 2024/08/05 15:15 (external edit)